Basement bathroom addition
Lead remodeler · Private residence — Arvada, CO · Aug – Sep 2025 · 4 weeks
Added a full three-quarter bath to an unfinished basement: new rough-in through the slab, an up-flush system for the shower, and a layout that kept the egress window clear.
Basement bathNew rough-inConcrete cuttingEjector pumpPermitted work
Overview
Impact
4 weeks
Start to finish
42 sq ft
New room
3 of 3
Inspections passed first time
Turned a storage corner into a legal, permitted full bath, which let the owners rent the basement as a separate suite the following month.
Reviews
“Cutting into the slab sounded terrifying and Marcus walked us through every step. He pulled the permits himself and we passed every inspection without a callback.”